Michael S. Currier Center Construction Update

February 27th


The finishing touches continue to close the gap between the outward appearance of the building and the interior. The main auditorium entrance is now finished with the same European steamed beech that graces the interior walls. Cubbies provide space for student gear and there's a coat room just inside the entrance. The moveable walls of the secure gallery space have had their handles polished and await the alumni art that will adorn them for the opening show, April 16-June 16. There will be an opening reception April 16th from 4-6 p.m. The hallway outside the dance studio now has a long wooden bench with cubbies below and the multi-purpose music room has shelves and work stations installed.